FY2024

U.S. transit by mode

NTD sorts every service into a mode: bus, heavy rail, commuter rail, demand response, ferry and a dozen more. Cost per ride only means something within a mode, because the modes are doing different jobs.

Boardings by mode

Ten-year series, stacked

How full, and how fast

FY2024. Passengers aboard is passenger miles over vehicle miles: how many people are on board on average, at any moment.

This is the number that makes cost per ride legible. Demand response costs what it does because it carries less than one passenger per vehicle mile, by design: a booked trip for one person is the service.

Cost per ride by mode

FY2024. Modes carrying less than a tenth of a percent of U.S. boardings are left out of the chart; they are all in the table below.

Every mode, FY2024

Mode Boardings Share of U.S. rides Passenger miles Average trip Passengers aboard Speed Operating cost Cost / ride Subsidy / ride Fare recovery
Bus 3.66B
47.7%
12.46B 3.41 mi 6.54 12.02 mph $30.11B $8.24 $7.33 11% Detail →
Heavy Rail 2.82B
36.8%
11.5B 4.07 mi 16.83 17.78 mph $12.27B $4.35 $2.93 32.6% Detail →
Commuter Rail 363.8M
4.7%
8.66B 23.8 mi 24.82 29.72 mph $8.88B $24.41 $18.07 26% Detail →
Light Rail 343.4M
4.5%
1.81B 5.26 mi 15.99 15.34 mph $3.39B $9.88 $8.94 9.5% Detail →
Demand Response 139.6M
1.8%
804.3M 5.76 mi 0.72 15.38 mph $7.06B $50.62 $47.16 6.8% Detail →
Bus Rapid Transit 71.4M
0.9%
175.1M 2.45 mi 12 10.32 mph $354.2M $4.96 $4.38 11.6% Detail →
Ferryboat 69.5M
0.9%
472.4M 6.8 mi 80.88 9.42 mph $1.17B $16.88 $12.52 25.8% Detail →
Trolleybus 63M
0.8%
101.4M 1.61 mi 11.48 6.56 mph $353.1M $5.60 $5.01 10.5% Detail →
Commuter Bus 45.6M
0.6%
963M 21.1 mi 9.63 24.91 mph $1.12B $24.52 $18.32 25.3% Detail →
Streetcar 37.5M
0.5%
64.6M 1.72 mi 11.27 6.65 mph $299.9M $7.99 $7.47 6.5% Detail →
Vanpool 23.6M
0.3%
877.4M 37.18 mi 4.52 41.52 mph $191.2M $8.10 $2.33 71.2% Detail →
Monorail / Automated Guideway 12.8M
0.2%
14.6M 1.14 mi 7.09 8.3 mph $82.6M $6.44 $5.71 11.4% Detail →
Hybrid Rail 5.87M
0.1%
62M 10.56 mi 14.96 24.05 mph $154M $26.22 $24.89 5.1% Detail →
Aerial Tramway 4.37M
0.1%
793.9K 0.18 mi 0.19 11.17 mph $9.41M $2.15 $1.97 8.4% Detail →
Cable Car 3.93M
0.1%
4.88M 1.24 mi 24.44 2.15 mph $81M $20.64 $16.04 22.3% Detail →
Publico 1.85M
0%
5.66M 3.06 mi 1.8 10.67 mph $6.47M $3.49 $0.22 93.8% Detail →
Inclined Plane 767.4K
0%
463.9K 0.6 mi 12.75 2.69 mph $4.8M $6.26 $1.54 75.4% Detail →
Alaska Railroad 234.7K
0%
29.3M 124.68 mi 22.82 26.59 mph $64.3M $273.95 $112.09 59.1% Detail →